Road Closure & Bus Detours-S. State Street between Granger and Oakbrook

Back to Blog Posts

Published: Fri, 11/16/2018 - 2:55 PM

Please note the following road closure information from the City of Ann Arbor:

South State St. from Granger to Oakbrook: Monday, Nov. 26 - Friday, Feb. 1, 2019. Both directions will be closed to traffic for the installation​ of a duct bank for DTE. 

Southbound South State Street will be detoured south on Packard Street, west on East Stadium Boulevard, south on South Industrial Highway, west on Stimson Street and back to South State Street.

Northbound South State Street will be detoured east on East Eisenhower Parkway,​ north on South Industrial Parkway, east on East Stadium Boulevard, north on Packard Street, and back to South State Street.

Southbound traffic will be maintained between Stimson Street and East Eisenhower Boulevard. Pedestrian traffic will be maintained on both sides of the road. ​

Please note the following bus detour information for Routes 6 & 62 from TheRide:

Routes 6 and 62 will be on detour beginning, Monday 11/26/18 until further notice due to construction. BTC=Blake Transit Center

Route 6 to BTC: from S Industrial Hwy, (R) Stadium Blvd, (L) Packard, (R) State St, resumes route.

Route 6 from BTC: from State St, (L) Packard, (R) Stadium Blvd, (L) S Industrial Hwy, resumes route.

All stops to and from the BTC will be missed on Stimson and from State St to Packard.

 

Route 62 to Wolverine Tower: from State St, (L) Packard, (R) Stadium Blvd, (L) S Industrial Hwy, (R) Stimson, (L) State St, resumes route.

Route 62 to Campus: from the State St Park and Ride Lot, (R) State St, (L) Oakbrook Dr, (R) Boardwalk, (R) Eisenhower, (L) S Industrial Hwy, (R) Stadium Blvd, (L) Packard, (R) State St, resumes route.

All route 62 stops to campus will be missed from the State St Park and Ride Lot to State and Packard. In addition, all stops to Wolverine Tower will be missed on State and Packard to Stimson.